Scope of Clash Detection Services
Our scope is tailored to the specific requirements of each project, discipline, and delivery stage. From reviewing inputs and understanding technical requirements to preparing coordinated deliverables and incorporating client feedback, we provide structured support aligned with your drawings, specifications, standards, and commercial objectives. Each service scope is clearly defined to ensure accuracy, transparency, and seamless integration with your project team.
- Architectural and structural clashes
- Structural and MEP clashes
- Duct, pipe, cable-tray, and conduit clashes
- Ceiling and service-zone review
- Shaft and riser coordination
- Builder's work opening review
- Sleeves and embedded-item coordination
- Site installation sequence review
- Clash prioritization and issue tracking
- Re-testing after model revisions
Why Clash Detection Matters
Early coordination enables project teams to address design problems while changes are still relatively manageable. Vertus's existing VDC positioning emphasises early clash detection, reduced rework, improved communication, centralised coordination, and fewer RFIs.
Typical Deliverables
- Federated coordination model
- Clash detection report
- Issue screenshots and viewpoints
- Clash matrix by discipline
- Prioritized issue register
- Resolution status report
- Re-test and closure report
- Coordination meeting support, where required
Frequently Asked Questions
A hard clash occurs when two physical model elements occupy the same space.
A soft clash relates to required clearance, access, maintenance, safety, installation, or operational zones.
We identify issues, recommend coordination options, update models, and conduct re-checks according to the agreed scope.
Identify design conflicts, with the services of Vertus, before they become construction problems.